Chinese Bridge, Dumfries House, Ayrshire

Chinese Bridge, Dumfries House, Ayrshire

About Project

Jonny Briggs was a sub-contractor on this project, brought in to construct the double curved timber roof to the bridge. Due to the inaccessible location and height of the bridge, the roof was constructed in its entirety off site, including the copper cladding. It was then lifted onto the steel framed bridge by crane in one piece, minimising any risk of damage to the complex and fragile roof structure.

Date
March 23, 2018
Category
Bridges